Bookmark and Share
 
Friday, May 18, 2012
TutorialsIntralinkIntralink 3.0 Administration 2

ProE Tutorial and Video SubscriptionSubscribe Now For Instant Access To Over 95 Tutorials and Videos

 Intralink: Intralink 3.0 Administration 2
 

Intralink 3.0 Administration 2

 

This Pro Intralink Administration guide covers the ins and outs of setting up Release Procedures.

 
ProE Tutorial on Intralink 3.0 Administration 2

Building upon the previous Pro Intralink tutorial, this lesson takes an in-depth look at properly implementing Release Procedures for Pro Intralink. Your company, not doubt, has an established design cycle that your designs must traverse before objects are made or shipped. You may even have more than one. The challenge is to integrate your current process into Pro Intralink with out many changes, ideally with no changes.

It is important to ask yourself several questions while working through this tutorial such as "What states must a design pass through before it goes out the door?" Another may be "How does a design move from one state to the next?". These and many other questions are addressed to help you best setup up Pro Intralink for your environment.

 

Pro/ENGINER Video

Download Training Guide Sample
ProE Video on Intralink 3.0 Administration 2 Download ProE Training Manual on Intralink 3.0 Administration 2
Includes 19 Page
ProE Training Guide

Topics Covered

 
  • Implementing Release Procedures with Pro Intralink
  • Folder Categories
  • Pro Intralink Case Study
  •  

    Additional Training Details

    Commercial Versions Available:  3.0, 3.1, 3.2
    Student Versions Available:  
    Model Name:  IN6
    Difficulty:  2
     
      
    Copyright 2012 by Harby